back to Well Intervention

Enchanced Oil Recovery

Optimising production from existing assets is more critical than ever, and good preparation is essential to ensure the well is clean, in order to get the best results from a programme of gas, thermal or chemical injection.

Secc are working with the industry incorporating suitable clear access point on the subsea tree or manifold where connection can be made using our Hot Make Hot Break Coupling, enabling operators to perform frequent and planned well clean-out operations time- and cost-efficiently.