back to News
Secc’s EQD’s – Built For The Job, Patent Protected, DNV Qualified and above all else Field Proven with over 15 years of service behind us.
25/07/2022
Caltex Oil Tools and C-Innovation recently returned these two 2” 15Ksi Mid Line Weak Links to shore after a 6 month intervention campaign in the Gulf of Mexico.
They’re in immaculate condition.
Here’s what Caltex Oil Tools and C-Innovations reported back to us:
- Campaign consisting of at least 10 Wells
- Pumping more than 185,000 bbls
- SECC 100% up time
- SECC 100% pass on testing and operation
- SECC Zero maintenance
- SECC Zero rebuilds required during campaign
- Broad spectrum of organic/inorganic acids, solvents, brines, and concentrations #engineeringatitsbest #oilandgas # quality #manufacturing #subseaengineering #oilgas #wellintervention

