
Secc’s Modular Skid has been deployed for over 15 years supporting RLWI (Riserless Light Well intervention) campaigns on the Agbami Field in Nigeria. This solution, designed and manufactured by Secc integrates 2 x HMHB, Pipe work, Tee-piece, Fabricated Skid, Hoses and HIGHFLOW Hot Stab into 1 skid. This allows the Skid to be placed adjacent to the Intervention package and connected via flying lead, in turn removing weight from the Intervention package. Whilst offering Dual EQD for the downlines and full bore (2”) throughout the Skid.